About the project
- Date: June 2024
- Client: Burton n’ Bamber Limited
- Category: Power Optimization Projects
- Address: Matuu, Kenya
Installation and commissioning of a high-capacity AVR (120KVA) to stabilize voltage, protect sensitive equipment, and improve power reliability.

